Developed in 1938 through 1941 on the basis of the M2. Mass-produced from 1941. More than 13,000 vehicles in various versions were built, from the M3 to the M3A3, all of which were supplied to almost every allied nation under Lend-Lease. The M3 tanks were designated Stuart I by the British, while the M3A1 version received the designation Stuart III. The M3 first saw action in the battle at Sidi Rezegh.
Commander
Loader
Characteristics are specified for vehicles with crews trained to 100%.